Skip to content

Plot scenarios on the risk graph

The Plot checkbox decides which curves the risk graph draws: the position, a structure or a scenario. The toolbar’s Combined / Separate switch decides how.

  • Combined draws each ticked scenario on top of the position.
  • Separate draws the scenario’s legs alone as a dashed curve beside the position’s.

In Combined, hover a scenario row to read its figures with the position included.

To compare two repairs, model each as a scenario, tick both in Plot and read which one leaves the better worst case.